The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and inādepth technical skills to participate as a member of a project team in a mentored role.
C_TS422_2020 Exam Certification Details:
| Duration: | 180 mins |
| Cut Score: | 56% |
| Sample Questions: | SAP C_TS422_2020 Exam Sample Question |
NEW QUESTION 45
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Quantity
- B. Scrap percentage
- C. Item type
- D. Installation point
Answer: A,D
NEW QUESTION 46
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
- A. Net requirements calculation is sales order-specific.
- B. Production orders are created with sales order reference.
- C. Storage location MRP areas are required.
- D. Sales order-specific stock is created
- E. Sales order-specific planning run is required.
Answer: A,B,D
NEW QUESTION 47
What is a work center hierarchy in SAP S/4HANA capacity planning?
- A. A group of alternative work centers providing a cumulative available capacity for production
- B. A group of alternative work centers for production, structured in hierarchy levels by prior ties
- C. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
- D. A group of work centers in a production line beingused in sequence for production
Answer: A
NEW QUESTION 48
Which data model changes have been implemented in Sales and Distribution? There are 3 correct answers to this question.
- A. Elimination of output condition tables
- B. Elimination of document index tables
- C. Elimination of LIS tables for rebates
- D. Elimination of status tables
- E. Elimination of customer master tables
Answer: B,D,E
NEW QUESTION 49
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named "W1904_1000_001". What does the suffix 001 in the resource name represent?
- A. Available capacity version
- B. Work center category
- C. Capacity category
- D. Number of individual capacities
Answer: C
NEW QUESTION 50
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Production supply area
- B. Rate routing
- C. Control cycle
- D. Replenishment strategy
Answer: C
NEW QUESTION 51
Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials? There are 2 correct answers to this question.
- A. Production version data
- B. MRP area data
- C. Storage location data
- D. Warehouse number data
Answer: C,D
NEW QUESTION 52
In which data objects do you maintain the production line as the work center forrepetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Production cost collector
- B. Production version
- C. Repetitive manufacturing profile
- D. Routing
Answer: B,D
NEW QUESTION 53
At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?
- A. The requirements date occurs that of a firmed planned receipt
- B. A firmed planned receipt cannot be rescheduled
- C. The requirements date occurs before that of a firmed planned receipt
- D. The requirement no longer exists
Answer: C
NEW QUESTION 54
How would you define pegging in the context of Advanced Planning?
- A. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
- B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
- C. An evaluation that is ordered according to thebill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
- D. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
Answer: C
NEW QUESTION 55
For which planning-relevant data objects do you set just one indicator to include then in PP/DS?
There are 2 correct answers to this question.
- A. Material
- B. Production version
- C. Work center
- D. Plant
Answer: A,C
NEW QUESTION 56
What Kanban status automatically posts goods receipt with reference to the procurement element?
- A. Empty
- B. Wait
- C. Full
- D. In use
Answer: C
NEW QUESTION 57
What does the industry sector determine? Note: There are 2 correct answers to this question.
- A. Which material master views can be maintained
- B. Whether a material master fieldis required, changeable, displayed, or hidden
- C. Which transaction you can use to create a new material
- D. Whether material numbers are assigned internally or externally
Answer: A,B
NEW QUESTION 58
What are the consequences if operation status Dispatched is set for a production order operation?
- A. You can reschedule the operation using lead the scheduling.
- B. You can reschedule the order using lead time scheduling.
- C. You can reschedule the operation using finite Scheduling in a planning board.
- D. You canreschedule the order using material requirements planning.
Answer: C
NEW QUESTION 59
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
- A. The item category of the component in the BOM
- B. The Individual/Collective indicator of the component
- C. The Planning Strategy of the finished product
- D. The MRP Type of the component
Answer: B
NEW QUESTION 60
Which advanced functionality has been embedded in SAP S/4HANA? There are 3 correct answers to this question.
- A. Supply Network Planning
- B. Available-to-promise
- C. Demand planning
- D. Capacity planning
- E. Backorder processing
Answer: B,D,E
NEW QUESTION 61
What are the three layers in the SAP Best Practices Content for SAP S/4HANA? There are 3 correct answers to this question.
- A. Building Blocks
- B. Scope Items
- C. Process Flows
- D. Solution Package
Answer: A,B,D
Explanation:
E, Test Scripts
NEW QUESTION 62
You want to represent setup time as a graphical object in the Detailed Scheduling Planning Board. Which actions are needed? There are 2 correct answers to this question.
- A. Create and assign setup group/setup keys in the production data structure.
- B. Create and assign a new graphical object for setup time in the planning board.
- C. Create and assign a setup matrix with setup transition time to the resource
- D. Run setup minimization heuristics or optimizer.
Answer: B,C
NEW QUESTION 63
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
There are 2 correct answers to this question.
- A. 100% check
- B. By usage probability
- C. First in first out (FIFO)
- D. Simultaneous
Answer: A,B
NEW QUESTION 64
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?
- A. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
- B. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
- C. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
- D. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
Answer: C
NEW QUESTION 65
Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question.
- A. MRP Live can priorities demand from sales orders
- B. MRP Live can create production orders automatically
- C. MRP Live can plan materials with recursive BOMs
- D. MRP Live can propose alternative solutions
Answer: B,D
NEW QUESTION 66
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Consumption-based planning
- B. Forecast planning
- C. Material requirements planning
- D. Manual planning without check
Answer: A
NEW QUESTION 67
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers tothis question.
- A. Add the agreement to the source list and mark itfor MRP relevance.
- B. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
- C. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
- D. Add the agreement to the quota arrangement and mark it for MRP relevance.
Answer: A,B
NEW QUESTION 68
What is the difference between co-products and by-products?
- A. Onlyco-products can be manufactured in isolation from the main product.
- B. Only by-products have a zero inventory valuation.
- C. Only co-products are identified by a special item category in the bill of material (BOM).
- D. Only co-products appear in the processor production order settlement rule.
Answer: D
NEW QUESTION 69
......
SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books | Weighting |
|---|---|---|
| Lean Manufacturing in SAP S/4HANA | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Production Orders in SAP S/4HANA | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Capacity Planning in SAP S/4HANA | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Introduction to SAP S/4HANA Supply Chain Planning | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Master Data in SAP S/4HANA | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Process Orders in SAP S/4HANA | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Demand Management in SAP S/4HANA | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. TS421, TS422 (SAP S/4HANA 2020) | < 8% |